Removal and installation of kitchen units and components to an agreed layout, including coordination of associated trades.
A kitchen or bathroom quotation should name the products being installed and who supplies them. Strip-out can reveal damaged subfloors, services or walls that were not visible at survey. Coordinating plumbing, tiling, cabinetry and final sealant work keeps these junctions clear.
What should be checked?
The visible finish is only part of the decision. The existing condition, suitable materials, safe access and how the work affects occupants all influence the scope. Where the cause or substrate cannot be confirmed from photographs, an inspection may be required.
Related work
Planned bathroom refurbishment from strip-out through preparation, installation, tiling and final finishing.
The quotation should say whether this related work is included, optional or excluded. Where another specialist or regulated trade is needed, that requirement should be identified clearly before scheduling.
Other details in the same project
Preparation and installation of suitable wall and floor tiles, including trims, grout and movement joints.
Alterations and installation connected with agreed sanitaryware, taps, showers, sinks and appliances, subject to existing services.
Practical question
What happens if hidden damage is discovered?
Rot, failed subfloors, unsafe services or water damage concealed behind finishes are reported before additional work proceeds.
Requesting a quotation
Provide the full address, clear photographs or video, the areas affected and the result you expect. Mention access restrictions and any known history of the defect, so the next step can be a quotation, inspection or specialist survey as appropriate.